Outcomes
Connector assembly inspection — getting the specification right before going to market
The challenge
A Tier 1 automotive supplier needed to automate visual inspection of a complex connector assembly. They had received two unsolicited proposals from integrators with wildly different approaches and price points, and had no way to evaluate which — if either — was appropriate. They needed a proper specification before going back to market.
Our approach
We spent two days on-site understanding the production process, the defect types, the cycle time constraints, and the integration requirements. We then produced a detailed technical RFQ covering camera and optics requirements, lighting strategy, algorithm approach, acceptance criteria, and integration specification — giving all suppliers the same brief.
Result
Three comparable proposals came back within specification. The client selected a solution at 30% less than the highest quote, with full confidence it met their requirements. The system passed FAT first time.